12,000+assets with a maintenance strategy in SAP-PM
2,987maintenance plans created and audited
7Pelton turbines assessed
Figures from the founder's professional track record; assets and plans correspond to a single SAP-PM implementation.
01 — Who we are
Methods born in aviation, applied to every rotating asset
Radiani Company S.A.S. is a Colombian engineering company specialized in maintenance planning, SAP-PM asset management and the reliability of turbomachinery and rotating equipment.
Reliability-Centered Maintenance (RCM) was born in commercial aviation. We bring that same rigor to turbines, pumps, compressors and the infrastructure behind every operation.
FIG. 01 · REFURBISHED FRANCIS RUNNER
Mission
Keeping the assets that cannot fail in service.
We plan and manage the maintenance of turbines, pumps, compressors and critical rotating equipment. We apply the reliability methods born in aviation, supported by condition monitoring and by CMMS platforms such as SAP-PM, Fracttal or whichever system your organization runs. The result: higher availability, safety and control over your assets.
Vision · 2031 horizon
By 2031, Radiani Company will be one of the reference firms in maintenance management and reliability for critical rotating and aviation infrastructure, with an international presence and on its way to becoming an aviation maintenance organization.
02 — Portfolio
Six service lines. One goal: availability.
S-01
Maintenance planning and scheduling
Strategy, plans, backlog, workload and critical-path shutdowns.
MASTER PLAN · SCHEDULE · KPI
S-02
Asset management and CMMS
Functional implementation in SAP-PM, Fracttal and other CMMS: ISO 14224 hierarchy, task lists, plans and data audits.
IMPLEMENTATION · AUDIT
S-03
Reliability engineering
RCM (SAE JA1011), FMEA/FMECA, root cause analysis, criticality and RAM.
RCM MATRIX · RCA REPORT
S-04
Condition monitoring
Vibration analysis (ISO 20816) and on-site dynamic balancing (ISO 1940).
CONDITION REPORT
S-05
Technical oversight, QA/QC and commissioning
Overhauls, GD&T dimensional control, NDT supervision and commissioning.
INSPECTION PROTOCOL
S-06
Technical training
Turbomachinery, reliability and maintenance planning.
TAILORED COURSES
Authorized distributor of Sielecom Vibration sensors.
S-01 — Maintenance planning
The right work, at the right time, with resources ready
01
Criticality
Which assets matter most
02
Strategy
Preventive, predictive or overhaul
03
Plan
Tasks, durations and resources
04
Schedule
Backlog and workload
05
Execution
Critical-path shutdowns
06
Measurement
Compliance, MTBF, MTTR
Cycle ↺ KPIs feed back into criticality and strategy: measurable continuous improvement.
CMMS — Digital maintenance management
Your maintenance strategy, alive inside your CMMS
01Functional implementation in SAP-PM and Fracttal
02Asset taxonomy and hierarchy per ISO 14224
03Criticality and RCM strategies loaded into the system
04Task lists and maintenance plans
05Spare parts cataloguing and inventory
06Data audits, queries and reports
07Maintenance budgeting
08Audit and consulting across the full work-order flow
Functional and data implementation. Software licensing is provided by the vendor.
REFERENCE · FULL IMPLEMENTATION AT A PUBLIC UTILITY, 2025–2026
FIG. 02 · DIMENSIONAL CONTROL OF A TURBINE RING
S-03 · S-04 · S-05 — Reliability, condition and QA/QC
Detect before failure. Verify against the drawing.
The earlier a failure is detected, the more time there is to plan the intervention. And every intervention is verified against measurable acceptance criteria.
RCMReliability-Centered Maintenance plans and FMEA/FMECA
RCAFailure investigation with technical report and actions
VIBVibration analysis and on-site balancing
GD&TDimensional and geometric control (ASME Y14.5)
CXVerification and commissioning protocols
Case study — Hydroelectric plant · Colombia
Full assessment of 7 Pelton turbines after a hydrological event
CHALLENGE
A sediment-laden flow shut down the plant. We had to define what to repair, what to replace and in what order.
SCOPE
Visual and dye-penetrant inspection of buckets, injectors, deflectors and spherical valves, component by component.
DELIVERABLE
Component-level rehabilitation plan: damage level, acceptance criterion and recommended action.
7units inspected
172findings recorded
42deflectors affected
Work performed by the founder as an engineer at an engineering firm.
Aviation and aerospace
Engineering for what keeps every flight going
MRO shops, airports, state aviation, aeroderivative turbines and aerospace manufacturing.
Authorized distributor. Selection advice, direct purchase and technical support.
Single-axis accelerometers
TOP AND SIDE EXIT
SVHS-150Premium, top exitSVHS-150SPremium, side exitSVHS-100Standard, top exitSVHS-100SStandard, side exitSVHS-170Compact, top exitSVHS-170SCompact, side exitSVHS-180SCompact, side exit
Special accelerometers
TRIAXIAL · TEMPERATURE · 4–20 mA
SVHS-173Premium triaxialSVHS-100STAcceleration and temperatureSVHS-420Velocity, 4–20 mA outputSVHS-422Acceleration, 4–20 mA output
Capsules and accessories
MOUNTING AND INSTALLATION
SVHS-070Shear capsuleSVHS-050Compression capsuleMountingMagnetic bases and padsCablesCables and connectors
Mechanical engineer specialized in maintenance and reliability management. VCAT-II vibration analyst (Mobius Institute, M-170096-01) and Fracttal One certified. 15+ years of hands-on field experience in Colombia and the United States, and responsible for the engineering of every Radiani project.
ASSETSSAP-PM: 12,000+ assets and 2,987 maintenance plans
AERODER.GE TM2500: preservation and pre-assembly (USA)
GASSolar Taurus 60: operation and maintenance
HYDROPelton and Francis: maintenance, diagnostics, rehabilitation and owner’s engineering